Pergolas and alfresco roofs

Open pergola or roofed alfresco over your Mernda deck? When a building permit applies, which registration class fits and what a pergola over a deck costs.

An open pergola over a Mernda deck can be built without a building permit if it stays within the size, height and siting limits in Schedule 3 of the Building Regulations 2018; put a solid roof on it and it becomes a verandah or, if free-standing, a gazebo, and both usually need a permit. A published Melbourne guide puts a basic timber or aluminium pergola over a deck of about 4 x 4 m to 4 x 6 m at $5,250 to $15,750. Pricing, design and the build are handled by the independent provider who takes your enquiry, not by this site.

Illustrative photo for Pergolas and alfresco roofs

Pergola, verandah or alfresco roof: what is the difference?

The difference matters because it decides the permit. The Building and Plumbing Commission (BPC) sets out the categories on its landscaping guidance page.

Structure What it is Building permit, per BPC guidance
Pergola Open and unroofed, possibly with open-weave, permeable shade cloth Not needed if no more than 3.6 m high, no more than 20 m2 in floor area and within the siting rules
Larger pergola Same structure, bigger or taller Needed
Verandah Roofed structure, usually attached to the home Needed
Gazebo or cabana Usually free-standing with a roof Usually needed; very small non-habitable structures under 10 m2 can be exempt

Most people asking for an “alfresco roof” want a solid roof over the deck so it can be used in rain, and that puts the job in the verandah row. Insulated panel roofs, steel sheet roofs and opening louvre systems all fall under that heading once they form a roof.

Who can build it?

The BPC lists a pergola attached to your home as domestic building work, so once the contract price passes the BPC threshold the builder must be registered and a major domestic building contract is needed. Among the registration classes the BPC names for outdoor work are Domestic Builder (limited to the construction of shade structures), Domestic Builder (limited to the construction of non-habitable building structures) and Domestic Builder (limited to the construction of structural landscaping). Check the class on the BPC practitioner register before you sign.

What does a provider check before designing it?

  • Attachment. A roof fixed to the fascia or wall adds load to the house. Ask how the provider will confirm the house can carry it; for decks, the BPC points to a structural engineer for this question.
  • Roof water. A solid roof collects rain that has to go somewhere. Where a new downpipe has to connect to a drain, ask who is doing that part, because the BPC treats drain connections as plumbing work for a licensed plumber.
  • Siting. Boundaries, easements and the distance to the neighbour’s windows all feed into whether a pergola can stay permit-free.
  • Bushfire. A roof over a deck counts as an addition, and in a designated bushfire prone area the BPC requires additions to be built to AS 3959. Lots on the rural edge of the municipality are the ones to check.
  • The deck underneath. Posts for a roof often land on the deck. If the deck frame is old, the provider may want to put footings through it rather than rely on it. Our deck repairs page covers the condition check.

What does it cost?

The published band of $5,250 to $15,750 covers a basic open pergola of about 16 to 24 square metres. A roofed alfresco costs more because of the roofing, flashings, guttering, possible engineering and the permit, and none of our sources publishes a reliable Melbourne range for it, so we do not quote one. Ask for the roof, gutters, downpipes, lighting and fans to be listed separately so quotes line up. The Mernda decking cost guide shows how a pergola adds to a deck budget.

What a careful builder will not do

They will not call a roofed structure a pergola to avoid a permit, fix rafters into a fascia board without checking what sits behind it, or run roof water onto the deck or the neighbour’s side. They will not start until the permit is in hand where one applies.

Shade for Doreen and Mernda backyards

New houses in Doreen and Mernda often have a concrete slab or a fresh deck off the family room with no cover, and shade is usually the next request after the deck itself. If the deck is not built yet, plan the two together: post positions, roof height and water run-off are easier to get right in one design. Start with the timber deck page or the composite decking page if the floor is still to be chosen.

What to do next

Decide whether you want open shade or a roof, measure the area, and note which side of the house the deck faces. Then ask for pergola or alfresco roof quotes with those details and a photo of the back of the house.

Send a job enquiry

Frequently asked questions

Can I put shade cloth on a pergola without a permit?

An unroofed pergola with an open-weave, permeable covering can stay exempt from a building permit if it is no more than 3.6 m high, no more than 20 m2 in floor area and meets the siting rules. Solid roofing changes that.

Is a louvred roof a pergola or a verandah?

Treat it as a roof for permit purposes and ask the building surveyor to confirm. When louvres close they form a solid cover, so most owners should expect a permit and plan for gutters and downpipes.

Do I need council planning approval as well as a building permit?

Sometimes. Planning controls such as overlays can apply on top of the building rules. Ask your council's planning team or your building surveyor to check the address before you pay for detailed drawings.

Can a pergola be built on top of an existing deck?

It can if the deck frame can take the extra load, including wind uplift on a roof. Many builders prefer to run the posts to their own footings through the deck. Ask the provider how the posts will be supported.

Who connects the downpipes from an alfresco roof?

Connecting roof water to the property's stormwater drain is plumbing work for a licensed plumber. Check whether the builder's quote includes a plumber or whether you need to arrange one separately.