Find help with decking around Mernda and nearby suburbs.

How much does a deck cost in Mernda?

Mernda deck prices for 2026: published Melbourne rates per square metre for pine, hardwood and composite, plus stairs, railing, oiling and quote checks.

Supplied and built, a new deck in Mernda runs from $190 to $370 per sqm for treated pine up to $470 to $945 per sqm for premium composite boards, based on Melbourne prices published by What’s The Damage and verified in October 2026. For a medium hardwood deck of about 25 square metres, that guide gives a total of $8,400 to $16,800. Every figure below includes GST and is a published range, not a quote: the provider who inspects your yard sets the actual price, and this site is a referral service that does not quote or build.

Published Melbourne decking prices

All rows come from the same Melbourne decking cost guide so they can be compared with each other.

Item Published range
Treated pine deck $190 to $370 per sqm
Merbau hardwood deck $315 to $580 per sqm
Spotted gum hardwood deck $370 to $630 per sqm
Blackbutt hardwood deck $345 to $650 per sqm
Composite deck $295 to $735 per sqm
Premium capped or solid-core composite $470 to $945 per sqm
Medium hardwood deck, about 25 sqm, total $8,400 to $16,800
Balustrade or railing $160 to $470 per lm
Single deck steps $190 to $420 per step
One flight of deck stairs $1,050 to $4,725 per flight
Elevated or high-set deck surcharge $52 to $190 per sqm
Demolish and remove an old deck $21 to $58 per sqm
Sanding and oiling $26 to $63 per sqm
Clean and re-oil, no sanding $16 to $47 per sqm
Basic pergola over a deck, about 4 x 4 m to 4 x 6 m $5,250 to $15,750

What pushes a deck price up or down?

Board material. It is the biggest single choice. Treated pine sits at the bottom of the table, the hardwoods in the middle and composite spans the widest band, because entry-level boards and premium capped boards are very different products. The timber deck page and the composite decking page explain the trade-offs behind those numbers.

Area and shape. A bigger deck costs more in total, but the guide’s typical totals for small, medium and large hardwood decks work out slightly cheaper per square metre as the area grows, because delivery and set-out cost much the same on any job. Corners, angles, curves and boxed-in steps add cutting time and waste.

Height off the ground. A deck at door height on a flat block is the cheapest to build. Once the ground falls away, posts get longer, bracing increases and the published elevated surcharge applies. If the drop reaches 1 m, a balustrade is needed under the NCC Housing Provisions, priced per linear metre in the table.

Stairs. A single step or two is cheap. A full flight down a slope costs as much as several square metres of decking.

Removing the old deck. If there is an existing deck to pull out, demolition and removal adds a per-square-metre cost before anything new is built.

Access. Where the only way in is a narrow side path or through the house, materials are carried by hand and the labour figure rises.

Site conditions. Rock, fill, poor drainage, trees and services in the ground change the footing design. On a lot inside a designated bushfire prone area, AS 3959 applies and can change which materials are allowed.

What a deck quote should include, and what it often leaves out

A complete quote lists the board species or brand and board size, the subframe timber, the footing type, the fixing method, steps, balustrade, trims and fascia boards, the coating if any, site clean-up and rubbish removal.

Items that are often priced separately or left to you:

  • Building permit and building surveyor fees. Under Building and Plumbing Commission (BPC) guidance, a deck built on a structural subfloor is normally permit work. The surveyor’s fee and any council lodgement charges vary with the surveyor and council, so ask who pays them.
  • Engineering. A raised deck, a deck fixed to the house or a deck on difficult ground may need a structural engineer’s design.
  • Home Warranty. For eligible contracts signed from 1 July 2026, the BPC’s Home Warranty page says the registered builder pays the premium on work above the value threshold set out there. It may be built into the price or shown as a line item.
  • Oil or stain. Some builders hand over bare timber and price the first coat as an extra.
  • Shade. A pergola or roofed alfresco is a separate job. The pergola and alfresco roof page covers the permit difference.

How do I compare two deck quotes?

The BPC’s advice on finding a practitioner and getting quotes is to ask for an itemised quote that names brands, quality, quantity and specifications for materials, says whether the price is for the job or by the hour, and says whether it is fixed or can vary with material or labour costs. Line the quotes up item by item. A cheaper quote that leaves out stairs, railing, the permit or rubbish removal is not cheaper.

Then check the paperwork side:

  1. Confirm the builder’s registration and its class on the BPC practitioner register.
  2. If the contract price is above the threshold for a major domestic building contract under the Domestic Building Contracts Act 1995, expect a written contract from a registered builder.
  3. Ask who applies for the building permit and who the building surveyor will be.
  4. Ask what happens if the footing holes hit rock or fill, and how any variation will be priced.

Red flags in a deck quote

  • A builder who says a raised deck “doesn’t need a permit” without giving the reason in writing.
  • A request for a large cash payment up front, or payment into a personal account with no business details.
  • No registration number, or a registration class that does not cover structural work.
  • A single lump sum with no breakdown of materials, steps, railing or demolition.
  • A start date before the permit has been issued.
  • Pressure to sign the same day.

Keeping the deck costs down over time

Timber decks need a coat of oil or stain every so often, and the published rates for sanding and oiling and re-oiling are in the table above. Composite boards avoid that cost but start higher. Whether they work out cheaper over the life of the deck depends on its size and how often you would recoat timber. Small faults caught early are cheaper than a rebuild, so it pays to check the frame each year; the deck repairs page covers what to look for.

Prices around Mernda

The published figures are Melbourne metro averages, and the guide notes outer suburbs may vary. Travel within Mernda and the suburbs next to it is short, but a rural block near Whittlesea township can carry extra travel or delivery costs. The Mernda area page covers local site points that affect price, such as access and boundaries.

Get a price for your own deck

Measure the area, note the height at the back door and at the far edge, and decide on a material or two to compare. Then request deck quotes for your Mernda home and ask each provider to itemise against the table above.

Send a job enquiry

Frequently asked questions

Do the published deck prices include GST?

Yes. The Melbourne guide used on this site states that its prices include GST. When you compare quotes, check whether each one is shown with or without GST, because some builders quote before tax.

Why are deck quotes so different from each other?

Quotes differ because builders read the scope differently: board grade, footing method, steps, railing, demolition and permits are often included by one and left out by another. Ask every builder to itemise against the same list.

Is a deposit normal for a deck job?

A deposit is common, but the amount and when it is paid should be written in the contract. Ask the builder how the deposit is calculated for your contract price, pay it to the business account named on the contract and keep the receipt.

Does a deck add value to a house?

It can make a house more usable and appealing, but the return depends on the market and the quality of the work. Treat a deck as something you will use rather than a guaranteed gain at sale.

Can I save money by doing part of the job myself?

Some owners do the oiling or rubbish removal themselves. Structural work, footings and anything needing a permit should be left to a registered builder, and doing part yourself can complicate warranty cover.